Rocker boxes

To remove and to fit

To remove


12-4


2  Fit a new gasket to the correct position and fit the

rocker box. Fit the setscrews and cap screws of the

rocker box and ensure that the spherical ends of the

roc ker screws are correctly fitted in the sockets of the

push rods .

3 Tighten the setscrews and cap screws evenly until

the correct torque load is obtained.



1  Disconnect and remove the relevant air cleaner,

operation 18-1, and high pressure fuel pipes.

2 Remove the leak-off pipes from the fuel injectors on

the relevant bank and then remove the rocker box

cover.

3  Remove the connectors, for leak-off fuel, from the

fuel injectors.

4  Loosen the adjustment screws of the rockers.

5  Loosen the setscrews and the screws with socket

heads. The pressure of the valve springs will lift the

rock er box away from the cylinder head.

6 Remove the setscrews and cap screws and remove

the rocker box (A).

To fit

1  Ensure that the joint face of the cylinder head is

clean and fit the dowels for the rocker box.


4  Set the tappet clearances, page 39. Fit the

connectors for the leak-off to the fuel injectors,

through the sides of the rocker box, complete with

new sealing washers. Tighten to the correct torque

load.

5 Before the rocker cover is fitted, inspect the 'O' ring

seals for the fuel injectors and renew them if

necessary.

6  Fit a new gasket to the top face of the rocker box,

fit the rocker box cover and setscrews and tighten to

the correct torque load.

The rocker covers of some engines are retained by

ten setscrews and a two nuts.

7  Fit the leak-off pipes.


 

8  Fit the high pressure fuel pipes, complete with

rubber dampers and shrouds, between the fuel

injection pump and the fuel injectors. Tighten the pipe

connections at the fuel injectors and at the fuel

injection pump to the relevant torque: Engines fitted

with the Bosc h S7100 fuel injection pump, tighten to a

torque of 45 Nm (33 lbf ft). Engines fitted with the

Bosch S3000 fuel injection pump, tighten to a torque

of 25 Nm (15 lbf ft).

9  Ensure that there is no distortion of the high

pressure pipes during this operation.

10  Fit the relevant air cleaner assembly, operation

18-1.

To dismantle and to assemble

To dismantle


12-5


5  If relevant, check that the bore for the cup plug in

the end of the rocker box is clean. Apply 'Loctite 542'

to a new cup plug and press the cup plug into the

rocker box until it is aligned precisely with the wall.


1  If a cup plug is fitted to the bore of the rocker shaft,

it must be removed.

2 Remove the screw that provides the location for the

rocker shaft. Push the rocker shaft in one direction

enough to remove one of the 'O' ring seals from the

end of the shaft. Push the shaft in the other direction

to release the 'O' ring seal from the opposite end.

Continue to withdraw the shaft and remove the rocker

levers and the springs as they become free.

To assemble

1  If relevant, check that the bore for the cup plug in

the end of the rocker box is clean. Apply 'Loctite 542'

to a new cup plug and press it into the bore until it is

aligned with the wall of the rocker box.

2 Apply clean engine lubricating oil to the rocker shaft

and insert the end which has the opening into the bore

of the rocker box. Ensure that the direction of the oil

hole in the rocker shaft is  downward (toward the

cylinder head).

3 Push the rocker shaft through the end, enough to fit

the first rocker lever onto the rocker shaft. Continue to

push the rocker shaft through the rocker box and fit

the spring and the second rocker lever before the

rocker shaft enters the first pedestal. Fit the

remainder of the arms and springs in the correct

sequence.

4  Before the rocker shaft is pushed fully into its

correct position, fit the 'O' ring in its groove around the

rocker shaft. Push further the rocker shaft until the

bolt hole in the rocker shaft is aligned with the

threaded hole in the pedestal. Fit the bolt that holds

the rocker shaft, with a plain washer and a spring

washer, and tighten it securely.


6  For rocker boxes which do not have a cup plug in

the bore, insert the shaft into the bore from either end.

Ensure that the oil hole in the rocker shaft is directly

downward (toward the cylinder head). Fit the rocker

levers and the springs in the correct sequence and,

before the rocker shaft is fully into its correct position,

fit a new 'O' ring in the groove around the outer end of

the rocker shaft.

7  Push carefully the rocker shaft through the bore

until the groove at the opposite end is just away from

the wall at the end of the rocker box. Fit the second 'O'

ring and press backward the shaft until the bolt hole in

the rocker shaft is aligned with the threaded hole in

the pedestal. Fit the bolt that holds the rocker shaft,

with a plain washer and a spring washer, and tighten

it securely.

 

To inspect and to correct

1  Remove all of the grease and dirt from the


12-6



components by the use of a cleaning fluid which can

be diluted with water. Wash and dry each item before

inspection.

2 Inspect the rocker shaft for wear or damage around

the locations of the rocker levers. If wear is seen,

renew the shaft.

3  Fit each rocker lever onto the shaft and check the

clearance in the bush of the rocker lever. If the

clearance is excessive, make locally a suitable tool as

shown (A) to press out the bush. Make an accurate,

temporary, mark on the rocker lever to indicate the

position of the small cut-out in the end of the bush and

then press out the bush.

4  Check the bore of the rocker lever for deep

scratches or other damage.

5 If the condition of the rocker lever is acceptable, the

same tool with suitable modifications, similar to the

illustration (B), can be used with a press to fit a new

bush into the roc ker lever. Ensure that the cut-out in

the new bush (B1) aligns exactly with the temporary

mark on the rocker lever. If it does not, press out the

bush and try again. When the operation is finished,

make a final check that the oil holes in the bush are

aligned with the passages in the rocker lever. New

bushes are pre-finished and do not need to be

reamed.

6  Use a fine oilstone to remove small grooves and

scratches and to make a s mooth surface on the pads

of the rocker levers. Ensure that the surface of the

pad is seen to be parallel to the bore by the use of the

roc ker shaft and a straight edge.

 

免費熱線
400-100-8969???15088860848
機組銷售
0574-26871589? 15267810868
配件銷售
0574-26886646? 15706865167
維修熱線
0574-26871569  18658287286
手機端
微信公眾號
在線客服
主站蜘蛛池模板: 亚洲AV成人一二三区观看 | 一女多男两根同时进去性视频 | 18国产精品白浆在线观看免费 | 亚洲中文字幕无码中文 | 日韩视频在线观看不卡 | 亚洲AV无码男人的天堂在线 | 免费人成在线观看成人片 | 妺妺窝人体色www美国 | 午夜福利18以下勿进 | 人妻无码一区二区三区TV | 精品无码一区二区的天堂 | 狠狠热在线视频免费 | 日本熟妇的牲交牲欲视频 | 国产AV熟妇人震精品一品二区 | 日本免费福利视频 | 日产乱码一二三区别免费一 | 色综合色天天久久婷婷基地 | 国产理论剧情大片在线播放 | 无码人妻丰满熟妇A片护士 免费国产黄线在线观看 | 精品久久久久久无码国产 | 中文字幕国产精品一区二区 | 热RE99久久精品国产66热 | 最近中文字幕mv免费视频 | 9797在线看片亚洲精品 | 久久精品av麻豆的观看方式 | 久久久久se色偷偷亚洲精品av | 日本hd高清xxxxvideos | 性色欲情侣网站WWW 嫩草在线视频 | 久在线 | 麻豆一区产品精品蜜桃的广告语 | 亚洲AV成人无码网站天堂网久久 | 久久午夜夜伦鲁鲁片免费无码影院 | 久久99精品久久久久久久清纯 | 人妻丝袜AV中文系列先锋影音 | 日韩免费无码人妻波多野 | 免费追剧网址 | 国产成AV人片在线观看天堂无码 | 超级碰碰人妻中文字幕 | 嗯啊哦快使劲呻吟高潮视频 | 奶头好大下面好爽的视频 | 一本色道无码不卡在线观看 |