日韩人妻中文无码一区二区七区_经典久久久久_最近手机中文字幕1页_亚洲大尺度无码无码专线_日韩精品 中文字幕 一区_国产色情老熟女NBA控卫之神

首頁 產品展示>John Deere約翰迪爾強鹿柴油發(fā)動機搖臂總成的安裝方法

John Deere約翰迪爾強鹿柴油發(fā)動機搖臂總成的安裝方法

John Deere約翰迪爾強鹿柴油發(fā)動機搖臂總成的安裝方法,John Deere約翰迪爾強鹿柴油發(fā)動機搖臂總成的安裝方法技術支持,John Deere約翰迪爾強鹿柴油發(fā)動機搖臂總成的安裝方法費用,John Deere約翰迪爾強鹿柴油發(fā)動機搖臂總成的安裝方法服務中心,John Deere約翰迪爾強鹿柴油發(fā)動機搖臂總成的安裝方法價格規(guī)格資料查詢,John Deere約翰迪爾強鹿柴油發(fā)動機搖臂總成的安裝方法哪里有,John Deere約翰迪爾強鹿柴油發(fā)動機搖臂總成的安裝方法多少錢,John Deere約翰迪爾強鹿柴油發(fā)動機搖臂總成的安裝方法附近聯系電話,寧波日昕動力科技有限公司
產品咨詢

詳細描述

John Deere約翰迪爾強鹿柴油發(fā)動機搖臂總成的安裝方法

1. Install push rods in same location from which removed.NOTE: Valve stem tips are specially hardened; wear capsare not required.

IMPORTANT: Relieve tension on rocker arm adjustingscrew to avoid damaging rocker armshaft during installation.

2. Position rocker arm assembly on engine.

IMPORTANT: Oil supply hole in rocker arm shaftmust be positioned at the flywheel endof engine and facing downward whenrocker shaft is installed.

3. Lubricate all rocker arms with engine oil and makesure they move freely. Tighten rocker arm supportstuds in a criss-cross sequence to specifications.

Specification

Rocker Arm Support Studs—Torque ............................................................................. 60 N•m (44 lb-ft)

4. Adjust valve clearance. (See CHECK AND ADJUSTVALVE CLEARANCE earlier in this group.)

檢查和調整氣門間隙

IMPORTANT: Valve clearance MUST BE checked andadjusted with engine COLD.

1. Remove rocker arm cover and crankcase ventilatortube.

IMPORTANT: Visually inspect contact surfaces ofvalve tips, bridges and rocker arm wearpads. Check all parts for excessivewear, breakage, or cracks. Replaceparts that show visible damage.Rocker arms that exhibit excessivevalve clearance should be inspectedmore thoroughly to identify damagedparts.

Replace valves, seats, springs andretainers in pairs per cylinder if founddamaged. Also replace bridge if any ofthese parts are replaced.

2. Remove plastic plugs or cover plate from enginetiming/rotation hole (A) and timing pin hole (B).

NOTE: Some engines are equipped with flywheelhousings which do not allow use of an engineflywheel rotation tool. These engines with straightnose crankshafts may be rotated from front noseof engine, using JDG966 Crankshaft Front/RearRotation Adapter.

3. Using JDE83 or JDE81-1 Flywheel Turning Tool, rotateengine flywheel in running direction (clockwise viewedfrom front) until No. 1 cylinder is at TDC compressionstroke. Insert JDG1571 or JDE81-4 Timing Pin inflywheel.

If No. 1 cylinder rocker arms are loose, the engine is at

No. 1 TDC compression.

If No. 1 cylinder rocker arms are not loose, rotateengine one full revolution (360°) to No. 1 TDCcompression.

4. With engine lock-pinned at TDC of No. 1 piston’scompression stroke, check valve clearance to followingspecifications. (Use sequence for 4-cylinder or

6-cylinder engines as outlined on next page.)

Specification

Intake Valve Clearance Checking(Rocker Arm-to-Bridge) (Engine

Cold)—Clearance ................................ 0.31—0.38 mm (0.012—0.015 in.)Exhaust Valve ClearanceChecking (Rocker Arm-to-Bridge)

(Engine Cold)—Clearance................... 0.41—0.48 mm (0.016—0.019 in.)

5. If valves need adjusting, use the appropriate valveclearance adjustment procedure on the next page andadjust to specifications below. Loosen the jam nut (A)on rocker arm adjusting screw. Turn adjusting screw until feeler gauge slips with a slight drag. Hold the adjusting screw from turning with screwdriver and tighten jam nut to specifications. Recheck clearance again after tightening jam nut. Readjust clearance as necessary.

Specification

Intake Valve ClearanceAdjustment (RockerArm-to-Bridge) (Engine Cold)—

Clearance ................................................................... 0.36 mm (0.014 in.)

Exhaust Valve Clearance

Adjustment (RockerArm-to-Bridge) (Engine Cold)—

Clearance ................................................................... 0.46 mm (0.018 in.)

Rocker Arm Adjusting Screw Jam

Nut—Torque .................................................................... 27 N•m (20 lb-ft)

6. Install rocker arm cover and crankcase ventilator tube.

John Deere約翰迪爾強鹿柴油發(fā)動機4缸發(fā)動機的氣門調整方法

NOTE: Firing order is 1-3-4-2.

1. Using JDG1571 or JDE81-4 Timing Pin, lock No. 1piston at TDC compression stroke (B).

2. Adjust valve clearance on No. 1 and 3 exhaust valvesand No. 1 and 2 intake valves.

3. Turn crankshaft 360°. Lock No. 4 piston at TDCcompression stroke (C).

4. Adjust valve clearance on No. 2 and 4 exhaust valvesand No. 3 and 4 intake valves.

John Deere約翰迪爾強鹿柴油發(fā)動機6缸發(fā)動機的氣門調整方法

6-Cylinder Engine:

NOTE: Firing order is 1-5-3-6-2-4.

1. Using JDG1571 or JDE81-4 Timing Pin, lock No. 1piston at TDC compression stroke (B).

2. Adjust valve clearance on No. 1, 3 and 5 exhaustvalves and No. 1, 2, and 4 intake valves.

3. Turn crankshaft 360°. Lock No. 6 piston at TDCcompression stroke (C).

4. Adjust valve clearance on No. 2, 4 and 6 exhaustvalves and No. 3, 5, and 6 intake valves.

John Deere約翰迪爾強鹿柴油發(fā)動機氣門行程的測量方法

IMPORTANT: For a more accurate measurement,measure valve lift at 0.00 mm (0.00 in.)rocker arm-to-valve tip clearance andwith engine COLD.

NOTE: Measuring valve lift provides an indication of wearon camshaft lobes and camshaft followers or pushrods.

1. Remove rocker arm cover.

2. Using JDE81-1 or JDE83 Flywheel Turning Tool andJDG1571 or JDE81-4 Timing Pin inserted in flywheel,lock No. 1 piston at TDC compression stroke.

3. Set rocker arm-to-valve tip clearance to 0.00 mm (0.00in.) for:

· No. 1 and 3 exhaust and No. 1 and 2 intake valveson 4-cylinder engines.

· No. 1, 3, and 5 exhaust and No. 1, 2, and 4 intakevalves on 6-cylinder engines.

4. Place dial indicator tip on top of valve bridge. Preloadindicator tip and set dial at 0.0 mm (0.0 in.).

5. Remove timing pin from flywheel and manually rotateengine one full revolution (360°) in running directionusing appropriate flywheel turning tool.

6. Observe dial indicator reading as valve is moved to fullopen. Record maximum reading and comparewithspecifications given below.

Specification

Intake Valves—Lift 9.03—9.43 mm(0.356—0.371 in.)

Wear Limit .................................................................. 8.70 mm (0.343 in.)Exhaust Valves—Lift 9.32—9.72 mm(0.367—0.383 in.)

Wear Limit .................................................................. 9.00 mm (0.354 in.)

7. Follow same procedure for all remaining valves andrecord readings.

If valve lift on all valves is within specifications, adjustvalve lash to specified clearance. (See CHECK ANDADJUST VALVE CLEARANCE earlier in this group.)If valve lift on one or more valves is not withinspecification, remove and inspect entire valve train andcamshaft.

8. Rotate engine one full revolution (360°). Lock engineat:

· TDC No. 4 compression stroke for 4-cylinderengines.

· TDC No. 6 compression stroke for 6-cylinderengines.

9. Set rocker arm-to-valve tip clearance to 0.0 mm (0.0in.) for:

· No. 2 and 4 exhaust and No. 3 and 4 intake valveson 4-cylinder engines.

· No. 2, 4, and 6 exhaust and No. 3, 5, and 6 intakevalves on 6-cylinder engines.

10. Repeat steps 4—7.

免費熱線
400-100-8969???15088860848
機組銷售
0574-26871589? 15267810868
配件銷售
0574-26886646? 15706865167
維修熱線
0574-26871569  18658287286
手機端
微信公眾號
在線客服
主站蜘蛛池模板: 伊人大蕉综合网站亚洲最大 | 亚洲乱理伦片在线观看中字 | 稚嫩小奶娃h文 | 国产激情不卡 | 永夜星河免费看 | 色视频综合无码一区二区三区 | 欧美疯狂做受xxxx | japanesexxxx日本妇伦 | 性欧美xxxx乳 | 亚洲欧美日韩久久精品 | 少妇午夜福利一区二区 | 亚洲一区二区三区AV无码 | 亚洲色大成网站www 尤物永久免费AV无码网站 | 欧美一区二区三区国产 | 久久桃花| 影音先锋成人影院 | 好大好硬我要喷水了免费视频 | 国产精品成人99一区无码 | 老色鬼永久视频网站 | 俄罗斯ZOOM与人性ZOOM | 欧美牲交VIDEOSSEXES | 亚洲精品无码久久久影院相关影片 | 成年av网站全部免费毛片 | 最新永久无码AV网址亚洲 | 亚洲第一福利网站在线观看 | 亚洲综合一区二区三区四区五区 | 欧美日韩一区二区三区在线观看视频 | 精品人妻伦九区久久AAA片69 | 无人高清影视在线观看 | 久久久久无码专区亚洲AV | XXX波多野结衣苍井空 | 美女被男人桶到爽免费网站 | 国产精品免费久久久久软件 | 九九国产精品无码免费视频 | 精品国产一区二区三区色欲 | 亚洲国产成人AV毛片大全 | 国产成人精品无码专区 | 久久久久久久性潮 | 久久精品国产亚洲AV麻豆长发 | 狂躁美女bbbbbb视频 | 精品少妇XXXX |